The project, which replaced a surface parking lot across the street from the Figat7th shopping center, will eventually consist of a 42-story building featuring 438 studio, one-, and two-bedroom apartments above podium parking and approximately 7,500 square feet of ground-floor retail space.
Designed by Johnson Fain, the approximately 530-foot-tall building will be clad in glass with LEDs embedded into its façade. Mitsui Fudosan, per a condition of approval imposed by the Los Angeles City Planning Commission, is also required to encase the above-grade parking garage in the same type of glass wrapping the trunk of the tower - something which has not been seen before in Downtown. A landscaped amenity deck with a swimming pool will cap the podium.
At the time of its groundbreaking in mid-2020, completion of the 8th and Figueroa tower was expected within three years.